Construction supervisor
Engineering supervision across the build stages. Cost depends on project size, after inspection.
Visit fee SAR 50
A technician visits and inspects, then you receive a quote to approve before work starts.
Excludes VAT — see the cost estimate for the total.
Includes
- ✓Site visit
- ✓Progress report
- ✓Reviewing the contractors
Does not include
- ✕Architectural designs
- ✕Permits
Photos of the place are required with the order